PACKAGING
Showing all 3 results
-
BASIC
Each one of our pintle wires are individually labeled for easy identification, quality control and tracking purposes. These labels indicate the description of the pintle wire as well as the date ordered and purchase order number. With this information we can track the entire production process of each pintle wire we manufacture. -
PLASTIC REEL MODEL STP
INSTALLATION (STEP 1 AND 2)
STEP 1. Release the pin by turning the
security lock half pulled to maintain tension
on the pin.STEP 2. Pull the pin while carefully
inserting it in the junction spiral of the
conveyor belt.
TO REWIND THE PIN, IF NECESSARY (STEP 3)
STEP 3. Lift the latch and turn the mobile section counter clockwise using the
handle or crossbar model.
ATTENTION
Never turn the moving section of the reel clockwise, for it may tangle the pintle pin.
Further, a movement too sharp in manual insertion may damage the tip of the pintle pin. -
SPOOL
INSTALLATION (STEP 1,2,3 AND 4)
STEP 1. Undo the blue twist tie holding the spool to the metal wire, remove the
label and retie the twist tie in order to support the monofilament to the spool.
STEP 2. Undo the white
twist ties.STEP 3. Remove the red twist tie indicating
the beginning of the metal wire
(be careful while unwinding the wire leader).
STEP 4. Insert the wire leader into the spirals, up to the opposite extremity. Remove the
blue twist tie, insert a pencil in the hole of the spool and pull on the wire in order to only leave
the monofilament in place. Cut the wire and tie the monofilament to the conveyor belt.
ATTENTION
In order to avoid injuries, handle the unwinding wire leader with care once the red twist tie has been removed. Further, a movement too sharp in manual insertion may damage the tip of the pintle pin.